Product Description
|
100 |
150 |
250 |
500 |
1000 |
capacity |
100kg |
150kg |
250kg |
500kg |
1000kg |
Voltage |
380V |
380V |
380v |
380v |
380v |
Power |
21.7KW |
21.7KW |
27kw |
42 |
84 |
Maximum furnace temperatureºC |
120/200ºC |
120/200ºC |
120 |
120 |
120 |
Size(mm) |
1050*960*1235 |
970*930*1535 |
1000*1000*1850 |
1000*1000*1850 |
1000*1000*1850 |
Number of carts |
1 |
1 |
1 |
2 |
4 |
Number of layers of net disk or pole |
5 |
5 |
4-5 |
4-5 |
4-5 |
Installation Instructions
1. Turn on the power switch, and the power indicator is on; The phase sequence is normal when the green light is on
2. The formula selection and operation interface sets the drying temperature and drying time according to the process (the time starts when the set temperature is reached, and the front heating time does not count), sets the smoking temperature according to different smoking materials, and sets the smoking time according to the process;
3. Click Run in the formula selection and operation interface to start working.
4. When the smoke switch is turned to the automatic smoke electric heating, it will be kept at the set smoke temperature,
When the timer is set, start the smoke timer.
5. The parameters in the automatic one-way setting interface basically do not need to be modified
Detailed Photos